Staff Project Experience "Highlights"

Accusonics – Our staff has been associated with the installation, commissioning, and maintenance particulars for Accusonics over the past 10 years acting as one of their international field contractors.

CE Casecnan, Philippines – The Casecnan Multipurpose Project is located in the Philippines. The Casecnan Project is a combined irrigation and hydroelectric power project that transports 800 million cubic meters of water from two rivers through a 26 kilometer tunnel to generate 150 MW of electricity. This water is then discharged and used by the local Irrigation Administration to irrigate farmland. Using the dye dilution method our staff conducted a series of flow tests at varying flows to calibrate the newly installed Winter Kennedy flow meter located within the power house. The newly calibrated flow meter will be used to satisfy ongoing turbine efficiency monitoring and ensure accurate administration of the irrigation delivery infrastructure.

Hidroelectrica Rio Las Vacas Guatemala – The client was constructing a new hydro electric generating facility in a remote area outside of Guatemala City. Our staff was retained by Accusonics Technologies to install and commission the new flow meter system. The flow meter was installed on ten foot diameter pipe section consisting of 16 sensors. Our staff is factory trained installers for Accusonics Technologies.

St. Lucia, WASCO – Our staff conducted a major water throughput audit identifying the total non-revenue water components within their 16-water treatment/distribution centers across the whole of the Island. A majority of the efforts were concentrated among the largest of the systems that contributed a combined total above 80% of the population and water demand areas. A complete interviewing process took place to assess their internal controls relating the increasing amount of unaccounted-for water. Metering activities, calibration and meter change out programs, accounting strategies, personnel training, leak detection practices, repair turnover, pressure management, export, billing rate structures, tourism, and others were considered when proposing a plan of action to systematically reduce the wastage of water within the Island.

Trinidad & Tobago, WASA – Assisted in the procurement and complete technology transfer related to leak detection principles and implementation of varying strategies based on existing system demographics. A practical hands-on approach was used toward the proper use of ultrasonic transit-time, insertion electro-magnetic flow meters and various leak detection equipment.

Santo Domingo, Dominican Republic – A complete procurement and training program was delivered to the water purveyor for the use of treatment control and operation for block use analysis within their large transmission systems. Practical and theoretical training was delivered through the use of installation, profiling and verification of the performance of insertion turbine technology integrated with standalone data loggers.

Ford Mustang Plant – Dearborn, MI – Participating in the complete development of a facility audit & system process balance identifying a continuous combined flow demand measurement of all source meters and balanced against the entire process demand through flow measurement, interview, and engineering assessment of the intensity, duration, and frequency of water consumption patterns. Engineering decisions surrounding the increase in efficiency, conservations, water reuse strategies, and the overall economic benefit was predicted based on the development of this program.
 

     

 